• Construction/maintenance of Flood Mitigation Structure and Drainage System/ Improvement of Deteriorated Top West Mega Dike
    Client: DPWH Pampanga Second District
    Cost: P31.2 million
  • Rehabilitation of Aparri Road, SBFZ
    Client: Subic Bay Metropolitan Authority
    Cost: P16.3 million
  • Proposed Road Reblocking (Faith St., Portion of Am High Ave & Portion of Efficiency Ave, Subic Bay Gateway Park Phase I, SBFZ)
    Client: SBDMC
    Cost: P4.97 million
  • Construction of Asphalt Overlay at PRC Logistic and Training in Subic
    Client: Philippine Red Cross
    Cost: P5.7 million
  • Repair/Rehabilitation/Improvement of Gapan-Sa n Fernando Road (Arayat Section) K0083+617-K0089+706 w/ exception
    Client: DPWH Pampanga 1st District
    Cost: P13.57 million
  • Periodic Road Maintenance Project (2014)
    Client: Subic Bay Metropolitan Authority
    Cost: P40.69 million
  • 2014 Heavy Maintenance Works along Subic-Clark-Tarlac Expressway (SCTEX) Asphalt Pavement
    Resurfacing (Additional Works)
    Client:    Bases Conversion Development Authority (BCDA)
  • Asphalting of Tarlac-Pangasinan-La Union Toll Expressway (TIPLEx)
    Client: PIDC
    Cost: P430 million
  • 2014 Heavy Maintenance Works along Subic-Clark-Tarlac Expressway (SCTEx) Asphalt Pavement Resurfacing
    Client: BCDA
    Cost:  P68.5 million
  • Preventive Maintenance along JCT Layac-Balanga-Mariveles Port Road
    Client: DPWH 2nd District – Bataan
    Cost: P18.7 million
  • Asphalt Overlay of Gapan-San Fernando-Olongapo Road KO 119+300 to KO 122+400 Brgy. New Cabalan, Olongapo City
    Client: DPWH – Zambales
    Cost: P17.4 million
  • Annual Pavement Maintenance Project 2008 Subic Bay Freeport
    Client: SBMA
    Cost: P10 million
  • Construction of Jetty Protection Walls at Mouth of Kalaklan River, Kalaklan, Olongapo City
    Client: DPWH – Olongapo City
    Cost: P19.1 million
  • Asphalting of SCTEP P-1A
    Obayashi Corporation
    Cost:  P200 million
  • Spreading and Compaction of Cement Treated Base (CTB)
    Client: Obayashi Corporation
    Cost:  P45 million
  • Asphalting Works for Subic Bay Port Development Project
    Client: CPIP Development Corp.
    Cost: P140 million
  • Concreting of Various Road Olongapo City
    Client: DPWH – Zambales 2nd District
    Cost: P26 million
  • Subic Bay Development Project
    Client: PST –JV SBMA
    Cost:  P80 million
  • Miscellaneous Works @ Subic TechnoPark Works #1 & 2
    Client: STEP
    Cost: P15 million
  • Rizal – Argonaut Widening Project
    Client: AMO –IPM JV
    Cost: P55.1 million
  • Improvement of Subic Bay International Airport
    Client: New San Jose Builders
    Cost:  P20.6 million
  • Asphalting of Rizal Argonaut Widening Project Subic Bay Freeport Zone
    Client: AMO – IPM
    Cost: P72 million